The hydroelectric power plant has an installed capacity of 23.41 MW and an annual electricity generation capacity of 68,000,000 kWh, with a net head of 496 metres.
The project included the construction of two regulators, a 600-metre tunnel, a 4,900-metre diversion canal, a 1,300-metre penstock, and a powerhouse.