Project Overview
The hydroelectric power plant has an installed capacity of 23.41 MW and an annual electricity generation capacity of 68 million kWh, with a net head of 496 metres.
The project included the construction of two regulator structures, a 600-metre tunnel, a 4,900-metre diversion canal, a 1,300-metre penstock and a powerhouse.